대법원 2025다217883

Unjust Enrichment (부당이득금)부당이득금

Decided2026. 03. 12. Court대법원Reversed and remanded (destructive remand), with partial dismissal of the plaintiff's appeal
AI-generated English translation (summary, key points, decision summary and full text) for reference only — not an official translation and without legal effect. The Korean original below is authoritative.
AI Easy read — AI summary of this decision
AI-generated summary for reference only — the Korean original below is authoritative.

In a case where a former property owner delayed handing over real estate that had been expropriated by a redevelopment association (재개발조합), the Supreme Court held that the association could claim damages equivalent to rent (차임 상당 손해배상) for illegal occupation, even though it had no intention to lease the property. However, the Court found that the lower court failed to properly examine whether there was proximate causation between the delayed handover and the association's claimed additional financing costs from project delays, and reversed and remanded that portion. The plaintiff's appeal regarding the portion it had already fully won was dismissed for lack of standing to appeal.

Key takeaways
  • CaseA redevelopment association sued a former property owner for damages after the owner delayed handing over expropriated real estate needed for the redevelopment project.
  • OutcomeThe Supreme Court upheld damages for illegal occupation (rent-equivalent losses) but reversed and remanded the portion awarding additional financing cost damages, citing insufficient proof that the entire project was delayed as a result.
  • LessonA property owner can be liable for rent-equivalent damages for illegal occupation even without any rental intent, but claims for broader financial losses from project delays require solid proof that the delay actually affected the whole project, not just the handover itself.
Issues
  • Whether the owner of illegally occupied real estate may claim rent-equivalent damages even without any intention to lease the property
  • Whether proximate causation exists between the delay in handing over a building and the additional financing costs incurred due to delay of the entire redevelopment project
  • Whether a party who fully prevailed in the judgment below may appeal merely due to dissatisfaction with the reasoning of that judgment
  • Whether proximate causation is required when calculating damages under Article 202-2 of the Civil Procedure Act (민사소송법)
Key reasoning

Damages equivalent to rent for illegal occupation of real property do not require that the property actually be suitable or intended for rental; the burden lies with the illegal occupier to prove the special circumstance that no actual loss occurred. By contrast, to recover additional financing costs allegedly caused by delay in handing over the building, it is not enough to show mere delay in transfer—rather, the plaintiff must establish proximate causation (상당인과관계) between the occupation and an overall delay in the entire redevelopment project. Because the lower court awarded such damages without sufficiently examining whether the whole project was in fact delayed as a result, it committed an error in the application of law.

Summary of Decision (English, AI translation)

[1] The owner of real estate that has been unlawfully occupied may seek damages equivalent to rent or restitution of unjust enrichment against the unlawful occupant. However, where there are special circumstances such that the real estate owner would have had no possibility of earning rent-equivalent profit or other income even in the absence of the unlawful occupation, the owner may not claim damages or restitution of unjust enrichment; the burden of proving the existence of such special circumstances lies with the party asserting that no loss occurred. Meanwhile, the reason why an amount equivalent to rent must be returned as unjust enrichment for the unauthorized possession and use of real estate is that, when objectively evaluating the profit derived from the possession and use of the relevant real estate, it is reasonable to calculate it as the consideration that would have been agreed upon had the right to use the real estate been established by agreement between the parties; it is not a requirement that the relevant real estate be property capable of being leased. The "amount equivalent to rent" is merely the standard necessary for monetarily evaluating the unjust enrichment obtained from the unauthorized possession and use of the real estate.

[2] Since an appeal is a means of seeking the cancellation or modification, in one's favor, of a judgment unfavorable to oneself, an appeal against a lower court judgment that was entirely favorable to the appellant lacks the interest necessary to bring the appeal and is therefore inadmissible. In such a case, even if the appellant is dissatisfied with the reasoning of the judgment, there is likewise no interest in appeal.

[3] Article 202-2 of the Civil Procedure Act (민사소송법) provides: "Where it is recognized that damage has occurred but it is extremely difficult, given the nature of the case, to prove the specific amount of damage, the court may, comprehensively considering all circumstances recognized from the overall import of the pleadings and the results of the examination of evidence, determine as the amount of damages an amount that it deems reasonable." The purpose of this provision, under the principle of free evaluation of evidence, is to realize the ideal and function of the damages system—whose guiding principle is the fair and equitable sharing of loss—by lowering the degree of proof required in cases where, although the occurrence of damage has been proven, proof of the amount of damage is difficult due to the nature of the case; it does not grant the judge unfettered discretion in calculating the amount of damage. Where damage has actually occurred as a result of a tortious act but it is extremely difficult to prove the specific amount of damage, the court must actively exercise its power to seek clarification and otherwise urge proof, making its best efforts to explore indirect facts, in order to examine the specific amount of damage. If, even after such efforts, the specific amount of damage remains unknown, the court may reasonably evaluate the indirect facts serving as the basis for calculating the amount of damage and determine, pursuant to Article 202-2 of the Civil Procedure Act, an amount it deems reasonable as the amount of damages. However, even in such a case, there must be a proximate causal relationship between the tortious act and the damage.

[4] In a case where Housing Redevelopment and Improvement Project Association A (甲 주택재개발정비사업조합), following an expropriation ruling regarding a building and land owned by B (乙) within the improvement project zone, deposited compensation for loss with B designated as the beneficiary and completed registration of ownership transfer with respect to the real estate, but B thereafter delayed in surrendering the building, such that A sought against B damages equivalent to rent on the ground of unlawful occupation of the real estate as well as damages equivalent to additional financing costs on the ground of delay to the improvement project: with respect to the claim for damages equivalent to rent, it is difficult to conclude, merely from the circumstance that A intended to proceed with the improvement project without leasing the building, that there existed special circumstances under which A, as the real estate owner, would have had no possibility of earning rent-equivalent profit or other income even absent the unlawful occupation, such that A could not seek damages; and with respect to the claim for damages equivalent to additional financing costs, in order to find that A sustained such damage, it is not sufficient that the surrender of the building was merely delayed—it must be shown that the improvement project itself was thereby delayed as a whole—yet grounds for confirming this are difficult to find; moreover, while the financing-cost-equivalent damage asserted by A concerns the overall costs related to the operation of the improvement project, the area of the building whose surrender B delayed constitutes only an extremely small portion of the improvement project zone, and the building's location is at the edge of the project zone, so that it is unclear whether there was substantial interference with A's progress on demolition work, and if so, whether the degree of such interference was such as to warrant damages equivalent to financing costs; thus it is difficult to definitively conclude that there is a proximate causal relationship between the damage asserted by A and B's tortious act. The court held that the lower court's judgment, which denied A's claim for damages equivalent to rent while affirming A's claim for damages equivalent to additional financing costs without sufficiently examining these matters, erred in its understanding of the applicable law, among other errors.

Full text (English, AI translation) 13,072 chars

[Plaintiff, Appellee and Appellant] ○○○ Housing Redevelopment and Improvement Project Association (Attorneys of Law Firm Hyean, Kwak Jeong-hoon and 5 others, for the Plaintiff)

[Defendant, Appellant and Appellee] Defendant (Attorneys of Law Firm Jigyeong, Ko Ji-hye and 14 others, for the Defendant)

[Judgment Below] Incheon District Court Judgment 2023Na83120, decided September 19, 2025

[Order]

The judgment below is reversed, and the case is remanded to the Incheon District Court. The Plaintiff's appeal is dismissed as inadmissible with respect to the portion concerning the claim for damages equivalent to additional financing costs.

[Reasoning]

The grounds of appeal are examined.

1. Outline of the Case

According to the reasoning of the judgment below and the record, the following facts may be found.

A. The Plaintiff is a housing redevelopment and improvement project association established to implement a housing redevelopment project (hereinafter “the instant improvement project”) with an improvement zone of 32,886.90㎡ located in the vicinity of (omitted), Michuhol-gu, Incheon. The Plaintiff obtained authorization of the management and disposal plan from the Head of Michuhol-gu, Incheon Metropolitan City on September 13, 2021, and public notice thereof was given on the same day.

B. The Defendant owned the building and land listed in the attached list to the judgment below, located within the zone of the instant improvement project (hereinafter “the instant real estate,” and where the building and land are distinguished, referred to respectively as “the instant building” and “the instant land”).

C. On December 17, 2021, the Incheon Metropolitan City Regional Land Expropriation Committee rendered an expropriation ruling with respect to the instant real estate, fixing the commencement date of expropriation as February 10, 2022. The Plaintiff, designating the Defendant as the person entitled to the deposit, deposited 36,012,000 won as compensation for business loss on January 24, 2022, 876,512,850 won as compensation for loss of land and obstructing structures on February 4, 2022, and 26,231,752 won as relocation settlement money, housing relocation expenses, and moving expenses for movable property on August 29, 2022, respectively.

D. On March 4, 2022, the Plaintiff completed registration of transfer of ownership with respect to the instant real estate on the ground of expropriation dated February 10, 2022, and on July 26, 2023, the Defendant delivered the instant building to the Plaintiff.

2. As to the Plaintiff's Grounds of Appeal

A. The Portion Concerning the Claim for Damages Equivalent to Rent

1) Judgment of the Court Below

The court below determined, for the reasons stated in its judgment, that since the Plaintiff intended to proceed with the instant improvement project after receiving delivery of the instant real estate from the Defendant, rather than being in a situation where it would lease the property to a third party or otherwise utilize it for profit, it is difficult to find that the Plaintiff suffered damages equivalent to rent from being unable to use and profit from the instant real estate.

2) Judgment of the Supreme Court

However, the judgment of the court below is difficult to accept for the following reasons.

A) The owner of real estate that has been unlawfully occupied may claim from the unlawful occupant damages equivalent to rent, or the return of unjust enrichment, resulting therefrom. However, where there exist special circumstances such that the real estate owner would not have had any occasion to obtain profit equivalent to rent or other income even in the absence of the unlawful occupation, the owner may not claim damages or the return of unjust enrichment; the burden of proving such special circumstances lies with the party asserting that no loss occurred (see Supreme Court Decision 96Da14227, decided July 22, 1997; Supreme Court Decision 2015Da77717, 77724, decided June 15, 2017, etc.). Meanwhile, the reason why an amount equivalent to rent must be returned as unjust enrichment for unauthorized occupation and use of real estate is that, in objectively evaluating the profit derived from possessing and using the real estate, it is reasonable to calculate it as the consideration that would have been agreed upon had the right to use the real estate been established by agreement between the parties; it is not a requirement that the real estate in question be leasable property. The “amount equivalent to rent” is merely a standard necessary for monetarily evaluating the unjust enrichment obtained from unauthorized occupation and use of real estate (see Supreme Court en banc Decision 2017Da220744, decided May 21, 2020).

Therefore, the mere circumstance that the Plaintiff did not lease the instant building but instead intended to proceed with the instant improvement project is insufficient, by itself, to constitute special circumstances under which the Plaintiff, as the real estate owner, would have had no occasion to obtain profit equivalent to rent or other income.

B) Nevertheless, without conducting any particular examination as to whether special circumstances existed such that the Plaintiff would have had no occasion to obtain profit equivalent to rent or other income even absent the fact of the Defendant's unlawful occupation, the court below concluded, based merely on the circumstances stated in its judgment, that no damages equivalent to rent had occurred. This judgment of the court below contains an error that affected the conclusion of the judgment, in misapprehending the legal principles concerning the occurrence of damages equivalent to rent, or in failing to exhaust the necessary examination.

B. The Portion Concerning the Claim for Damages Equivalent to Additional Financing Costs

An appeal is a means of seeking, to one's own advantage, the cancellation or modification of a judgment unfavorable to oneself; therefore, an appeal against a judgment below that was entirely in one's favor is not permissible for lack of interest in appealing, and this holds true even where one is dissatisfied with the reasoning of such judgment (see Supreme Court Decision 2008Da51649, decided December 24, 2008). According to the record, the court below granted this portion of the claim in its entirety, and the Plaintiff filed the appeal merely asserting that “the court below failed to clearly determine the indirect facts for calculating the amount of damages under Article 202-2 of the Civil Procedure Act (민사소송법).” Therefore, this portion of the appeal is unlawful.

3. As to the Defendant's Grounds of Appeal Concerning the Portion on the Claim for Damages Equivalent to Additional Financing Costs

A. Judgment of the Court Below

The court below determined that the Defendant delayed the instant improvement project by refusing to deliver the instant real estate, thereby causing the Plaintiff damages equivalent to additional financing costs, and, considering: (1) that the expenditure of financing costs is an expense inevitably anticipated by the Plaintiff in proceeding with the instant improvement project; (2) that in improvement projects such as the instant one, schedules are often delayed due to various factors other than the relocation process, such as administrative procedures for permits and authorizations, government policy, and real estate market conditions; (3) that there were persons other than the Defendant who refused to deliver real estate within the zone of the instant improvement project; and (4) the duration and scale of the instant improvement project, the court below found that it was impossible to specifically identify the exact amount of the Plaintiff's damages caused by the Defendant's tortious act, such that this case falls under a case in which proof of the specific amount of damages is extremely difficult given the nature of the matter, and accordingly determined the amount of damages to be 20,000,000 won pursuant to Article 202-2 of the Civil Procedure Act (민사소송법).

B. Judgment of the Supreme Court

However, the judgment of the court below is difficult to accept for the following reasons.

1) Article 202-2 of the Civil Procedure Act (민사소송법) provides that “where the fact that damage occurred is established but proof of the specific amount of damages is extremely difficult given the nature of the matter, the court may determine, as the amount of damages, an amount considered reasonable, by comprehensively considering all circumstances found from the overall purport of the pleadings and the results of the examination of evidence.” This provision is intended, under the principle of free evaluation of evidence, to realize the ideals and function of the damages system—whose guiding principle is the fair and equitable sharing of loss—by mitigating the degree of proof required where, although the occurrence of damage has been proven, proof of the amount of damages is difficult given the nature of the matter; it does not confer upon the judge unfettered discretion in calculating the amount of damages (see Supreme Court Decision 2013Da65710, decided July 10, 2014, etc.). Where damage has actually occurred due to a tortious act but proof of the specific amount of damages is extremely difficult, the court must actively exercise its authority to clarify and otherwise urge proof, making its best efforts to explore indirect facts, and must examine the specific amount of damages in this manner; if, even thereafter, the specific amount of damages remains unknown, the court may reasonably evaluate the indirect facts serving as the basis for calculating the amount of damages and determine, pursuant to Article 202-2 of the Civil Procedure Act (민사소송법), the amount considered reasonable as the amount of damages (see Supreme Court Decision 2006Da3561, decided November 29, 2007; Supreme Court Decision 2018Da301336, decided March 26, 2020, etc.). However, even in such a case, there must be a proximate causal relationship between the tortious act and the damage (see Supreme Court Decision 2022Da235184, decided June 1, 2023, etc.).

2) Examining the reasoning of the judgment below in light of these legal principles:

As noted above, although the Defendant was obligated to deliver the instant building to the Plaintiff from August 29, 2022, when all of the compensation money had been deposited, the Defendant did not deliver the instant building until July 26, 2023. However, in order to find that the damages equivalent to additional financing costs asserted by the Plaintiff occurred, it is insufficient merely to show that delivery of the building was delayed; it must further be shown that, as a result thereof, the instant improvement project as a whole was delayed. However, it is difficult to find any basis confirming this.

Moreover, while the damages equivalent to financing costs asserted by the Plaintiff represent the entire cost associated with operating the instant improvement project, the area of the first floor of the instant building, whose delivery the Defendant delayed, is only 157.83㎡, an extremely small portion of the 32,886.90㎡ zone of the instant improvement project, and the location of the instant building was at the edge of the project zone. It is thus unclear whether there was any substantial obstruction to the Plaintiff's demolition work, and if so, whether the degree thereof was such as to warrant compensation for damages equivalent to financing costs. Therefore, it is difficult to conclude that there is a proximate causal relationship between the damages asserted by the Plaintiff and the Defendant's tortious act.

3) Nevertheless, without examining the actual period of delay in the instant improvement project caused by the Defendant's delay in delivering the instant building, or the damages and their scope that are in proximate causal relationship with the Defendant's tortious act, the court below readily concluded, based merely on the circumstances stated in its judgment, that damages equivalent to additional financing costs had occurred, and recognized the entire 20,000,000 won sought by the Plaintiff as the amount of damages. This judgment of the court below contains an error that affected the conclusion of the judgment, in misapprehending the legal principles concerning the occurrence of damage and proximate causal relationship in tort, and the calculation of the amount of damages under Article 202-2 of the Civil Procedure Act (민사소송법), thereby failing to exhaust the necessary examination.

4. Conclusion

The judgment below is reversed in its entirety, and the case is remanded to the court below for further hearing and determination. The portion of the Plaintiff's appeal concerning the claim for damages equivalent to additional financing costs is dismissed as inadmissible. This judgment is rendered by the unanimous opinion of the participating Justices, as set forth in the Order.

Justices Ro Kyung-pil (Presiding Justice), Lee Heung-koo (Justice in charge), Oh Seok-jun, Lee Suk-yeon

【판결요지】

[1] 불법점유를 당한 부동산의 소유자로서는 불법점유자에 대하여 그로 인한 차임 상당 손해의 배상이나 부당이득의 반환을 구할 수 있고, 다만 불법점유가 없었더라도 부동산소유자에게 차임 상당 이익이나 기타 소득이 발생할 여지가 없는 특별한 사정이 있는 때에는 손해배상이나 부당이득반환을 청구할 수 없는 것이지만, 그와 같은 특별한 사정에 관하여는 손실이 발생하지 않았음을 주장하는 쪽에서 증명할 책임을 진다. 한편 부동산의 무단점유·사용에 대하여 차임 상당액을 부당이득으로 반환해야 한다고 보는 이유는 해당 부동산의 점유·사용으로 인한 이익을 객관적으로 평가할 때 그 부동산 사용에 관한 권리가 당사자 간의 합의로 설정된다고 가정하였을 경우 약정되었을 대가로 산정하는 것이 합리적이기 때문이지, 해당 부동산이 임대 가능한 부동산일 것을 요건으로 하기 때문이 아니며, ‘차임 상당액’은 부동산의 무단점유·사용으로 얻은 부당이득을 금전적으로 평가하는 데 필요한 기준일 뿐이다.

[2] 상소는 자기에게 불이익한 재판에 대하여 자기에게 유리하도록 그 취소·변경을 구하는 것이므로 전부 승소한 원심판결에 대한 상고는 상고를 제기할 이익이 없어 허용될 수 없고, 이 경우 비록 판결 이유에 불만이 있더라도 역시 상고의 이익이 없다.

[3] 민사소송법 제202조의2는 "손해가 발생한 사실은 인정되나 구체적인 손해의 액수를 증명하는 것이 사안의 성질상 매우 어려운 경우에 법원은 변론 전체의 취지와 증거조사의 결과에 의하여 인정되는 모든 사정을 종합하여 상당하다고 인정되는 금액을 손해배상 액수로 정할 수 있다."라고 규정하고 있다. 이는 자유심증주의하에서 손해의 발생사실은 증명되었으나 사안의 성질상 손해액에 대한 증명이 곤란한 경우 증명의 정도를 경감함으로써 손해의 공평·타당한 분담을 지도원리로 하는 손해배상제도의 이상과 기능을 실현하는 데 그 취지가 있는 것이지, 법관에게 손해액의 산정에 관한 자유재량을 부여한 것은 아니다. 불법행위로 인하여 현실적으로 손해가 발생하였으나 구체적인 손해의 액수를 증명하는 것이 매우 어려운 경우 법원은 적극적으로 석명권을 행사하는 등 증명을 촉구하여 간접사실들의 탐색에 최선의 노력을 다하는 방식으로 구체적인 손해액에 관하여 심리하여야 하고, 그 후에도 구체적인 손해액을 알 수 없다면 손해액 산정의 근거가 되는 간접사실을 합리적으로 평가하여 민사소송법 제202조의2에 따라 상당하다고 인정하는 금액을 손해배상 액수로 정할 수 있다. 그러나 이 경우에도 불법행위와 손해 사이에는 상당인과관계가 있어야 한다.

[4] 甲 주택재개발정비사업조합이 정비사업 구역 내 乙이 소유한 건물 및 토지에 관한 수용재결에 따라 乙을 피공탁자로 하여 손실보상금 등을 공탁하고 위 부동산에 관하여 소유권이전등기를 마쳤는데, 그 후에도 乙이 건물 인도를 지체하자 乙을 상대로 부동산 불법점유를 이유로 한 차임 상당의 손해배상과 정비사업 지연을 이유로 한 추가 금융비용 상당의 손해배상을 구한 사안에서, 차임 상당 손해배상청구의 경우 甲 조합이 건물을 임대하지 않고 정비사업을 진행하려고 하였다는 사정만으로 불법점유가 없었더라도 부동산소유자인 甲 조합에 차임 상당 이익이나 기타 소득이 발생할 여지가 없어 손해배상을 구할 수 없는 특별한 사정이 있는 때에 해당한다고 보기 어렵고, 한편 추가 금융비용 상당 손해배상청구의 경우 甲 조합에 그러한 손해가 발생하였다고 보기 위해서는 단순히 건물의 인도가 지연되었다는 것만으로는 부족하고 그로 인하여 정비사업 자체가 전체적으로 지연되었다고 볼 수 있어야 하는데 이를 확인할 수 있는 근거를 찾기 어려울 뿐만 아니라, 甲 조합이 주장하는 금융비용 상당의 손해는 정비사업 운영과 관련된 전체 비용인 데 반해 乙이 인도를 지연한 건물의 면적은 정비사업 구역의 극히 일부분에 불과하고 건물의 위치도 사업구역의 가장자리여서 甲 조합의 철거 공사 진행에 실질적인 방해가 있었는지, 그 정도가 금융비용 상당의 손해를 배상할 정도인지 분명하지 않으므로, 甲 조합이 주장하는 손해와 乙의 불법행위 사이에 상당인과관계가 있다고 단정하기 어려운데도, 이에 대해 충분히 심리하지 않은 채 甲 조합의 차임 상당 손해배상청구를 부정하고 추가 금융비용 상당 손해배상청구를 긍정한 원심판결에 법리오해 등의 잘못이 있다고 한 사례.

【참조조문】

[1] 민법 제393조, 제741조, 제750조, 제763조, 민사소송법 제288조[증명책임]

[2] 민사소송법 제390조, 제422조

[3] 민법 제393조, 제750조, 제763조, 민사소송법 제202조, 제202조의2

[4] 민법 제393조, 제750조, 제763조, 민사소송법 제202조, 제202조의2, 도시 및 주거환경정비법 제63조, 제65조 제1항, 제81조 제1항 제2호, 공익사업을 위한 토지 등의 취득 및 보상에 관한 법률 제40조, 제43조, 제45조 제1항

【참조판례】

[1] 대법원 1997. 7. 22. 선고 96다14227 판결(공1997하, 2618), 대법원 2017. 6. 15. 선고 2015다77717, 77724 판결, 대법원 2020. 5. 21. 선고 2017다220744 전원합의체 판결(공2020하, 1155) / [2] 대법원 2008. 12. 24. 선고 2008다51649 판결 / [3] 대법원 2007. 11. 29. 선고 2006다3561 판결(공2007하, 2012), 대법원 2014. 7. 10. 선고 2013다65710 판결, 대법원 2020. 3. 26. 선고 2018다301336 판결(공2020상, 819), 대법원 2023. 6. 1. 선고 2022다235184 판결

【주문】·【이유】 전문 4,894자 · 펼쳐 보기

【원고, 피상고인 겸 상고인】 ○○○주택재개발정비사업조합 (소송대리인 법무법인 혜안 담당변호사 곽정훈 외 5인)

【피고, 상고인 겸 피상고인】 피고 (소송대리인 법무법인 지경 담당변호사 고지혜 외 14인)

【원심판결】 인천지법 2025. 9. 19. 선고 2023나83120 판결

【주 문】

원심판결을 파기하고, 사건을 인천지방법원에 환송한다. 원고의 상고 중 추가 금융비용 상당의 손해배상청구 부분을 각하한다.

【이 유】 상고이유를 판단한다.

1. 사안의 개요

원심판결 이유와 기록에 의하면 다음 사실을 알 수 있다.

가. 원고는 인천 미추홀구 (이하 생략) 일원 32,886.90㎡를 정비구역으로 하여 주택재개발사업(이하 ‘이 사건 정비사업’이라 한다)을 시행하기 위하여 설립된 주택재개발정비사업조합으로서 2021. 9. 13. 인천광역시 미추홀구청장으로부터 관리처분계획인가를 받았고, 같은 날 그 고시가 되었다.

나. 피고는 이 사건 정비사업 구역 내에 있는 원심판결 별지 목록 기재 건물 및 토지(이하 ‘이 사건 부동산’이라 하고, 건물과 토지를 구분할 경우에는 ‘이 사건 건물’, ‘이 사건 토지’라 한다)를 소유하였다.

다. 인천광역시 지방토지수용위원회는 2021. 12. 17. 이 사건 부동산에 관하여 수용개시일을 2022. 2. 10.로 정하여 수용재결을 하였다. 원고는 피고를 피공탁자로 하여 2022. 1. 24. 영업권 손실보상금 36,012,000원을, 2022. 2. 4. 토지 및 지장물 손실보상금 876,512,850원을, 2022. 8. 29. 이주정착금, 주거이전비 및 동산이전비 26,231,752원을 각각 공탁하였다.

라. 원고는 2022. 3. 4. 이 사건 부동산에 관하여 2022. 2. 10. 수용을 원인으로 한 소유권이전등기를 마쳤고, 피고는 2023. 7. 26. 원고에게 이 사건 건물을 인도하였다.

2. 원고의 상고이유에 대하여

가. 차임 상당의 손해배상청구 부분

1) 원심의 판단

원심은 판시와 같은 이유로, 원고가 이 사건 부동산을 피고로부터 인도받은 다음 이 사건 정비사업을 진행하려고 한 것이지 타에 임대하거나 다른 용도로 활용하여 수익을 얻을 상황은 아니었으므로, 이 사건 부동산을 사용·수익하지 못하여 차임 상당액의 손해를 입었다고 보기 어렵다고 판단하였다.

2) 대법원의 판단

그러나 원심의 판단은 다음과 같은 이유로 수긍하기 어렵다.

가) 불법점유를 당한 부동산의 소유자로서는 불법점유자에 대하여 그로 인한 차임 상당 손해의 배상이나 부당이득의 반환을 구할 수 있고, 다만 불법점유가 없었더라도 부동산소유자에게 차임 상당 이익이나 기타 소득이 발생할 여지가 없는 특별한 사정이 있는 때에는 손해배상이나 부당이득반환을 청구할 수 없는 것이지만, 그와 같은 특별한 사정에 관하여는 손실이 발생하지 않았음을 주장하는 쪽에서 증명할 책임을 진다(대법원 1997. 7. 22. 선고 96다14227 판결, 대법원 2017. 6. 15. 선고 2015다77717, 77724 판결 등 참조). 한편 부동산의 무단점유·사용에 대하여 차임 상당액을 부당이득으로 반환해야 한다고 보는 이유는 해당 부동산의 점유·사용으로 인한 이익을 객관적으로 평가할 때 그 부동산 사용에 관한 권리가 당사자 간의 합의로 설정된다고 가정하였을 경우 약정되었을 대가로 산정하는 것이 합리적이기 때문이지, 해당 부동산이 임대 가능한 부동산일 것을 요건으로 하기 때문이 아니며, ‘차임 상당액’은 부동산의 무단점유·사용으로 얻은 부당이득을 금전적으로 평가하는 데 필요한 기준일 뿐이다(대법원 2020. 5. 21. 선고 2017다220744 전원합의체 판결 참조).

따라서 단지 원고가 이 사건 건물을 임대하지 않고 이 사건 정비사업을 진행하려고 하였다는 사정만으로 부동산소유자인 원고에게 차임 상당 이익이나 기타 소득이 발생할 여지가 없는 특별한 사정이 있는 때에 해당한다고 보기 어렵다.

나) 그런데도 원심은 피고의 불법점유라는 사실이 발생하지 않았더라도 원고에게 차임 상당 이익이나 기타 소득이 발생할 여지가 없다는 특별한 사정에 대하여는 별다른 심리도 하지 아니한 채, 단지 판시와 같은 사정만으로 차임 상당의 손해가 발생하지 않는다고 단정하였다. 이러한 원심판결에는 차임 상당의 손해 발생 등에 관한 법리를 오해하거나 필요한 심리를 다하지 아니하여 판결에 영향을 미친 잘못이 있다.

나. 추가 금융비용 상당의 손해배상청구 부분

상소는 자기에게 불이익한 재판에 대하여 자기에게 유리하도록 그 취소·변경을 구하는 것이므로 전부 승소한 원심판결에 대한 상고는 상고를 제기할 이익이 없어 허용될 수 없고, 이 경우 비록 그 판결 이유에 불만이 있더라도 역시 상고의 이익이 없다(대법원 2008. 12. 24. 선고 2008다51649 판결 참조). 기록에 의하면 원심은 이 부분 청구를 전부 인용하였고, 원고는 단지 ‘원심이 민사소송법 제202조의2에 따른 손해액 산정을 위한 간접사실을 명확하게 판단하지 않았다.’고 주장하면서 상고를 제기하였을 뿐이다. 따라서 이 부분 상고는 부적법하다.

3. 추가 금융비용 상당의 손해배상청구 부분에 관한 피고의 상고이유에 대하여

가. 원심의 판단

원심은, 피고가 이 사건 부동산의 인도를 거부하여 이 사건 정비사업을 지체시켰고 이로 인하여 원고에게 추가 금융비용 상당의 손해가 발생하였는데, ① 금융비용 지출은 원고가 이 사건 정비사업을 진행함에 있어서 필연적으로 예상되는 비용인 점, ② 이 사건 정비사업은 이주절차 외에도 인허가를 위한 행정절차나 정부정책, 부동산 경기 등 여러 변수로 인하여 일정이 지연되는 경우가 많은 점, ③ 피고 외에도 이 사건 정비구역 내 부동산의 인도를 거부한 사람들이 있었던 점, ④ 이 사건 정비사업의 기간 및 규모 등을 종합하면, 피고의 불법행위로 인한 원고의 손해가 얼마인지 명확하게 특정하는 것은 불가능하여 이 사건은 구체적인 손해의 액수를 증명하는 것이 사안의 성질상 매우 어려운 경우에 해당한다는 이유로 민사소송법 제202조의2에 따라 그 손해액을 20,000,000원으로 정하였다.

나. 대법원의 판단

그러나 원심의 판단은 다음과 같은 이유로 수긍하기 어렵다.

1) 민사소송법 제202조의2는 "손해가 발생한 사실은 인정되나 구체적인 손해의 액수를 증명하는 것이 사안의 성질상 매우 어려운 경우에 법원은 변론 전체의 취지와 증거조사의 결과에 의하여 인정되는 모든 사정을 종합하여 상당하다고 인정되는 금액을 손해배상 액수로 정할 수 있다."라고 규정하고 있다. 이는 자유심증주의하에서 손해의 발생사실은 증명되었으나 사안의 성질상 손해액에 대한 증명이 곤란한 경우 증명의 정도를 경감함으로써 손해의 공평·타당한 분담을 지도원리로 하는 손해배상제도의 이상과 기능을 실현하는 데 그 취지가 있는 것이지, 법관에게 손해액의 산정에 관한 자유재량을 부여한 것은 아니다(대법원 2014. 7. 10. 선고 2013다65710 판결 등 참조). 불법행위로 인하여 현실적으로 손해가 발생하였으나 구체적인 손해의 액수를 증명하는 것이 매우 어려운 경우 법원은 적극적으로 석명권을 행사하는 등 증명을 촉구하여 간접사실들의 탐색에 최선의 노력을 다하는 방식으로 구체적인 손해액에 관하여 심리하여야 하고, 그 후에도 구체적인 손해액을 알 수 없다면 손해액 산정의 근거가 되는 간접사실을 합리적으로 평가하여 민사소송법 제202조의2에 따라 상당하다고 인정하는 금액을 손해배상 액수로 정할 수 있다(대법원 2007. 11. 29. 선고 2006다3561 판결, 대법원 2020. 3. 26. 선고 2018다301336 판결 등 참조). 그러나 이 경우에도 불법행위와 손해 사이에는 상당인과관계가 있어야 한다(대법원 2023. 6. 1. 선고 2022다235184 판결 등 참조).

2) 이러한 법리에 비추어 원심판결 이유를 살펴본다.

피고가 손실보상금이 모두 공탁된 2022. 8. 29.부터 원고에게 이 사건 건물을 인도할 의무가 있음에도 2023. 7. 26.에서야 이 사건 건물을 인도하였음은 앞서 본 바와 같다. 그러나 원고 주장의 추가 금융비용 상당의 손해가 발생하였다고 보기 위해서는 단순히 건물의 인도가 지연되었다는 것만으로는 부족하고 그로 인하여 이 사건 정비사업 자체가 전체적으로 지연되었다고 볼 수 있어야 한다. 그런데 이를 확인할 수 있는 근거는 찾기 어렵다.

게다가 원고가 주장하는 금융비용 상당의 손해는 이 사건 정비사업 운영과 관련된 전체 비용인 데 반해, 피고가 인도를 지연한 이 사건 건물 1층의 면적은 157.83㎡로서 이 사건 정비사업 구역 32,886.90㎡ 중 극히 일부분에 불과하고 이 사건 건물의 위치도 사업구역의 가장자리여서 원고의 철거 공사 진행에 실질적인 방해가 있었는지, 그 정도가 금융비용 상당의 손해를 배상할 정도인지 분명하지 않다. 그러므로 원고 주장의 손해와 피고의 불법행위 사이에 상당인과관계가 있다고 단정하기 어렵다.

3) 그런데도 원심은 피고의 이 사건 건물 인도 지체로 인하여 이 사건 정비사업이 실제 지연된 기간 및 피고의 불법행위와 상당인과관계에 있는 손해와 그 범위 등에 관하여 심리하지 않은 채 그 판시와 같은 사정만으로 추가 금융비용 상당의 손해가 발생하였다고 쉽게 단정하고 원고가 구하는 20,000,000원 전액을 손해액으로 인정하였다. 이러한 원심판단에는 불법행위에서 손해의 발생과 상당인과관계, 민사소송법 제202조의2에 따른 손해액 산정 등에 관한 법리를 오해하여 필요한 심리를 다하지 아니함으로써 판결에 영향을 미친 잘못이 있다.

4. 결론

원심판결을 전부 파기하고, 사건을 다시 심리·판단하도록 원심법원에 환송하며, 원고의 상고 중 추가 금융비용 상당의 손해배상청구 부분은 각하하기로 하여, 관여 대법관의 일치된 의견으로 주문과 같이 판결한다.

대법관 노경필(재판장) 이흥구(주심) 오석준 이숙연

Related statutes

Similar cases

Cases with high content similarity to this one.

#1
2022나2015616 · 서울고법 2022-10-27
부당이득반환등청구의소
#2
2002다48399 · 대법원 2002-12-10
Objection to Distribution
#3
2000다32475 · 대법원 2000-09-29
Restitution of Unjust Enrichment
#4
2025두35801 · 대법원 2026-03-12
취득세등 부과처분취소
#5
2012나9180, 2012나9197(병합) · 서울고등법원 2013-05-15
Wages, etc.

Related tools & guides

AI answers need an account (free accounts: 2 per month) — submit and you'll return to this question after logging in. Search and case reading stay free.

Cross-check the original: 국가법령정보센터 (auxiliary link)